Panels and Service | Hampton Roads

Electrical panel replacement you understand before it starts

We show you whether you need a new panel or more power. You decide what is best for your home.

Stakes

Has anyone told you that you need a new panel without showing you why?

A panel replacement and a service upgrade are two different jobs at two different prices.

Most quotes do not say which one they are describing. So how would you know if you are paying for the right one?

VALUE

What you get before any panel work starts

Clarity.

You will know if you need a replacement or an upgrade, and why

The right fix.

Decided by a load calculation, not a guess. Not the bigger job if the smaller one does it

A plan in writing

The work and the cost, before anything starts.

GUIDE

You should not have to guess which panel job you need

Panel work is one of the bigger checks a homeowner writes. It should come with a straight answer.

We walk the panel with you, explain what we see, and show you the math behind the recommendation. We pull the permit and handle the Dominion coordination when the job needs it.

THE PLAN

How it works

1

Book your free Home Assessment

There is no charge for it

2

We walk your home with you

and run the load calculation, then explain what we find.

3

Get a written plan and cost

then decide

THE ZOOM

Do you need a new panel, or do you need more power?

If you want more power, for an EV charger, a heat pump, or an addition, you need the upgrade.

If the goal is getting rid of a Federal Pacific panel or a rusted out box, a replacement may be all you need

A panel replacement

Same size, new box

A new 100 amp panel where an old 100 amp panel was, or a new 200 where there was a 200. The meter, the mast, and the connection back to Dominion do not change. It is the smaller job.

Service upgrade

More Capacity

For example, 100 amps to 200 amps. Dominion has to disconnect and reconnect you. It can look like the same box on the wall, but it is a different job.

How to know

The load calculation decides

It tells you which one you need. It is also what stops you paying for an upgrade when a replacement would have done it.

THE ZOOM

What are the signs it is time to look at your panel?

Not sure if any of these apply? That is what the free assessment is for.

THE PLAN

What changes the cost of a panel job?

Six things, and most of them cannot be seen from the driveway.

1

Whether the service size changes.

The single biggest factor

2

Whether the meter base and mast come with it.

Often they do on older Hampton Roads homes, especially with weather exposure.

3

Grounding

Older homes often need new ground rods and the water pipe bond brought up to current code

4

Where the panel is.

A panel in a finished space with clearance problems costs more than one on a garage wall.

5

Breaker count and type.

AFCI and GFCI breakers required by current code
cost more than what comes out.

6

What is behind the wall.

Cloth insulation, knob and tube, or aluminum
branch wiring changes the job, sometimes by a lot.

WHY THIS MATTERS

What happens if you pick the wrong one?

It is expensive in both directions.

Pay for an upgrade you did not need, and you have spent thousands on capacity that sits unused.

Take the replacement when the upgrade was the right call, and you may pay for the panel twice. The EV charger or heat pump shows up two years later, and the new box cannot carry it.

Neither mistake is visible from the driveway. Both are visible in a load calculation.

WHY THIS MATTERS

So what is this going to cost?

Until someone has checked the meter base and mast, the grounding, and what is behind the wall, any number is a guess.

A guess that goes up when the truck arrives is worse than no number at all.

So we come look, tell you which job you are buying, and put the price in writing. There is no charge for the assessment.

WHY THIS MATTERS

Not ready to book yet?

Send us a photo of your panel. We will tell you what we see and what is worth a closer look

Related services

EV Charger Installation.

Find out if your panel can carry a charger.

Generators and Transfer Switch Installation.

Backup power that fits your panel.

Meter Base Replacement.

Often done at the same time as an upgrade

Home Inspection Electrical Repairs.

Panel flagged on your report? Start here.

FAQ

Common questions

Do I need a panel replacement or a service upgrade?

A load calculation decides it, not the age of the panel. If you are adding a big load like an EV charger or a heat pump, you may need the upgrade. If not, a same size replacement may be all you need.

There is no code requirement to replace one. But the breakers have a documented history of failing to trip, and most inspectors and electricians recommend replacing it. We will tell you the same, and we will tell you what it costs before anything starts

Yes. Panel and service work gets permitted and inspected. We handle the permit and the Dominion coordination, so you do not have to.

We come look first. Once we have seen the panel, the meter base, and the grounding, you get the price in writing.

No. The assessment is free, and you decide what happens next.

A written plan covers the work we can see. Older homes can hide damaged wiring, aluminum where copper was expected, or a panel that cannot take a circuit the project needs. If that happens, we stop, show you what we found, and price the change with you before any extra work is done.

The age of the house, anything you have noticed such as lights that flicker or a breaker that trips, any DIY work, and anything a home inspector flagged. Also tell us where the panel is, how to reach the attic or crawl space, and whether there are pets.

The age of the house, anything you have noticed such as lights that flicker or a breaker that trips, any DIY work, and anything a home inspector flagged. Also tell us where the panel is, how to reach the attic or crawl space, and whether there are pets.

Want to know which panel job your home really needs?

We will walk it with you, explain it in plain English, and put it in writing. Then you decide.