(757) 816-1406
Remodels | Hampton Roads
We show you what your remodel needs electrically. You decide what is best for your home.
A kitchen or bathroom remodel often needs updated wiring, outlets and switches moved to fit the new layout, new appliance circuits, GFCI protection, and new lighting. Current Contracting plans the electrical with you before the walls close, handles permits when the work calls for them, and puts the scope and cost in writing across Hampton Roads.
Stakes
Moving an outlet is simple with the walls open. After the drywall, tile, and backsplash go up, it is a different job.
And a new kitchen without enough circuits trips a breaker every time two appliances run at once.
WHAT YOU GET
You will know what the new layout needs electrically, and what has to happen before the walls close.
Circuits and outlets planned for how you will use the room. Not added later through finished walls.
The scope and the cost, before anything starts.
GUIDE
A remodel comes with a hundred decisions. The electrical ones are easy to miss until it is too late to change them.
We walk the plan with you, mark where everything goes, and explain what code and the appliances call for. We handle the permit and inspections when the work needs them.
A homeowner in the middle of a large remodel had a list of electrical problems. Circuits were not labeled. Wiring was disorganized. Nobody could say for sure what was safe. We walked the house with him, listened to what he knew about the home, and worked through every item on his list. The project got back on track, and so did his confidence.
THE PLAN
1
Bring your layout, or the drawings from your designer.
2
and explain what the electrical side needs.
3
then decide.
WHY THIS MATTERS
WHY THIS MATTERS
THE ZOOM
Electrical work in a remodel happens in two passes.
Missing the rough in window is what makes changes expensive.
Wires, boxes, and circuits go in while the walls are open. Where a permit is required, the rough in is often inspected before the walls close.
After the walls, cabinets, and counters are done, the outlets, switches, lights, and appliances get connected.
WHY THIS MATTERS
It can. Opening walls sometimes turns up older wiring that needs attention, and a permitted remodel may bring parts of the room up to current code. What applies depends on your locality and the scope of the job.
If we find something, we stop, show you, and explain it before anything changes.
WHY THIS MATTERS
It depends on the layout, the appliances, what is behind the walls, and whether the panel has room.
Moving two outlets in a bathroom and rewiring a kitchen with an island and a new range are not the same job.
So we walk the plan with you, explain what it needs, and put the cost in writing. There is no charge for the assessment.
WHY THIS MATTERS
Send them over with a few photos of the room as it is now. We will tell you what we see.
Circuits for each new appliance.
Recessed, pendant, and under cabinet lighting.
A bath fan that clears the steam.
GFCI protection, dimmers, and smart switches.
If the new kitchen needs more capacity.
FAQ
Often, yes. It depends on the scope of the job and your city or county. We tell you what applies and handle the permit and inspections when one is needed.
It depends on the appliances and the layout. Code generally calls for more than one countertop circuit, plus dedicated circuits for several appliances. We plan it from your appliance list.
Current code generally calls for GFCI protection on bathroom outlets. Requirements vary by locality. We include it in the plan.
Yes. It is easiest while the walls are open, during the rough in stage.
Early. Ideally during planning, and again for rough in before insulation and drywall. Late changes are where cost climbs.
We will walk it with you, explain it, and put it in writing. Then you decide.